EPA 2027 EV Tennessee: 12.8¢/kWh avg Off-Peak Est.: 8.2¢/kWh

How Much Does It Cost to Charge a 2027 Kia EV9 Long Range AWD GT-Line in Tennessee?

At Tennessee's average residential electricity rate of 12.8¢/kWh, a full 0–100% home charge for the 2027 Kia EV9 Long Range AWD GT-Line (~103.3 kWh usable battery, 280 mi EPA range) costs approximately $14.69 — or just $9.41 on an overnight EV Time-of-Use plan (8.2¢/kWh).

Full Home Charge (0–100%)
$14.69
$9.41 off-peak (~10% AC loss)
Cost per 100 Miles
$5.25
EPA: 41 kWh / 100 mi
Annual Cost (12,000 mi)
$630/yr
Saves ~$592/yr vs. gas
Solar Offset (TN)
9 Panels
~3.6 kW (4.7 sun hrs/day)

Interactive EV Charging & Solar Offset Calculator

Adjust your annual mileage, charging tariff (standard vs. overnight off-peak), and public DC fast charging mix.

Includes ~10% AC Charge Loss
Estimated Annual Charging Cost
$0.00
Saves $0/year vs. gas car
Full Charge (0–100%, 103.3 kWh) $0.00
Selected Session (80%) $0.00
Cost per 100 Miles (41 kWh) $0.00
Monthly Charging Cost $0.00
Annual Energy Required 0 kWh
Solar Panels Needed to Charge for $0/yr 0 panels (0 kW)

Official EPA Specifications — 2027 Kia EV9 Long Range AWD GT-Line

EPA Combined Efficiency41 kWh per 100 miles
EPA Electric Range280 miles
Estimated Usable Battery~103.3 kWh
Level 2 (240V) Full Charge Time10.5 hours
Tennessee Gas Comparison$2.85/gal avg vs. 12.8¢/kWh residential

Frequently Asked Questions — 2027 Kia EV9 Long Range AWD GT-Line in Tennessee

How much does it cost to fully charge a 2027 Kia EV9 Long Range AWD GT-Line at home in Tennessee?

At Tennessee's average residential electricity rate of 12.8¢/kWh, a full 0–100% home charge for the 2027 Kia EV9 Long Range AWD GT-Line (~103.3 kWh usable battery, including ~10% AC charging loss) costs approximately $14.69. On an overnight EV off-peak rate (8.2¢/kWh), it drops to $9.41.

How much does it cost to drive a 2027 Kia EV9 Long Range AWD GT-Line 100 miles in Tennessee?

With an official EPA combined efficiency of 41 kWh per 100 miles, driving 100 miles in Tennessee costs $5.25 at standard residential rates.

Is charging a 2027 Kia EV9 Long Range AWD GT-Line cheaper than gasoline in Tennessee?

Yes. Driving 12,000 miles per year costs about $630/year in electricity vs. ~$1,221/year for a 28 MPG gas car at $2.85/gal — saving roughly $592 per year.

How many solar panels do I need to charge a 2027 Kia EV9 Long Range AWD GT-Line in Tennessee?

Driving 12,000 miles/year requires ~4,920 kWh/year. With Tennessee's average solar yield (1,370 kWh/kW/yr), you need approximately 9 modern 400W solar panels (~3.6 kW) to offset 100% of your EV charging.

Compare 2027 Kia EV9 Long Range AWD GT-Line Charging Cost in Other States

Arizona (14.8¢) California (31.8¢) Colorado (15.1¢) Connecticut (28.9¢) Florida (14.6¢) Georgia (14.4¢) Hawaii (42.5¢) Illinois (16.2¢) Maryland (17.8¢) Massachusetts (29.4¢) Michigan (19.2¢) Minnesota (15.4¢) Nevada (15.9¢) New Jersey (19.5¢) New York (23.8¢) North Carolina (14.1¢) Ohio (15.8¢) Oregon (14.3¢) Pennsylvania (17.9¢) Tennessee (12.8¢) Texas (14.9¢) Utah (11.7¢) Virginia (14.8¢) Washington (11.9¢)

Other Kia Electric Models in Tennessee

2027 Kia Sportage Plug-in Hybrid (470 mi) 2027 Kia EV3 Long Range FWD (321 mi) 2027 Kia EV6 Long Range RWD (319 mi) 2027 Kia EV9 Long Range RWD (305 mi) 2027 Kia EV6 Long Range AWD (19 inch Wheels) (295 mi) 2027 Kia EV9 Long Range AWD (283 mi) 2027 Kia EV3 Long Range GT AWD (280 mi) 2027 Kia EV3 Long Range AWD (280 mi) 2027 Kia EV6 Long Range AWD (20 inch Wheels) (270 mi) 2027 Kia EV6 Standard Range RWD (237 mi)