How Much Does It Cost to Charge a 2027 Tesla Model Y AWD in Oregon?
At Oregon's average residential electricity rate of 14.3¢/kWh, a full 0–100% home charge for the 2027 Tesla Model Y AWD (~71.4 kWh usable battery, 294 mi EPA range) costs approximately $11.34 — or just $6.98 on an overnight EV Time-of-Use plan (8.8¢/kWh).
Interactive EV Charging & Solar Offset Calculator
Adjust your annual mileage, charging tariff (standard vs. overnight off-peak), and public DC fast charging mix.
Official EPA Specifications — 2027 Tesla Model Y AWD
| EPA Combined Efficiency | 27 kWh per 100 miles |
|---|---|
| EPA Electric Range | 294 miles |
| Estimated Usable Battery | ~71.4 kWh |
| Level 2 (240V) Full Charge Time | 8 hours |
| Oregon Gas Comparison | $3.75/gal avg vs. 14.3¢/kWh residential |
Frequently Asked Questions — 2027 Tesla Model Y AWD in Oregon
How much does it cost to fully charge a 2027 Tesla Model Y AWD at home in Oregon?
At Oregon's average residential electricity rate of 14.3¢/kWh, a full 0–100% home charge for the 2027 Tesla Model Y AWD (~71.4 kWh usable battery, including ~10% AC charging loss) costs approximately $11.34. On an overnight EV off-peak rate (8.8¢/kWh), it drops to $6.98.
How much does it cost to drive a 2027 Tesla Model Y AWD 100 miles in Oregon?
With an official EPA combined efficiency of 27 kWh per 100 miles, driving 100 miles in Oregon costs $3.86 at standard residential rates.
Is charging a 2027 Tesla Model Y AWD cheaper than gasoline in Oregon?
Yes. Driving 12,000 miles per year costs about $463/year in electricity vs. ~$1,607/year for a 28 MPG gas car at $3.75/gal — saving roughly $1,144 per year.
How many solar panels do I need to charge a 2027 Tesla Model Y AWD in Oregon?
Driving 12,000 miles/year requires ~3,240 kWh/year. With Oregon's average solar yield (1,260 kWh/kW/yr), you need approximately 7 modern 400W solar panels (~2.6 kW) to offset 100% of your EV charging.